Request for re-commissioning after laid-up

Your contact details

Please enter your contact details as completely as possible. We would like to stress that none of the entries are obligatory, except for the fields indicated by *. Please understand, however, that missing details can result in a delayed response.

 

Mr.      Mrs.
General information
Type of units
Unit No. 1 Unit No. 2 Unit No. 3 Unit No. 4
Type of unit
SCHOTTEL type 1 *
(e.g. SRP)
SCHOTTEL type 2 *
(e.g. 1515)
SCHOTTEL type 3 *
(e.g. CP)
Serial No. *
Operation hours *
Location
(e.g. Starboard)
lay-up conditions

Oil analyses available before and during lay-up?

yes     no

Minimum size: 19.5 KB

Maximum size: 5.0 MB

Allowed types: pdf

Maximum uploads: 0/10

Uploads left: 10 file(s) left to upload

Files:

Have all housings and gear boxes been filled up completely with oil?

yes     no

Preservation Measures before lay-up

Have all vent pipes been sealed?

yes     no

Climatic conditions in engine room/ Records during lay-up

Climatic conditions in switch boxes

Have thrusters been turned regulary during lay-up?

yes     no

Have main drives been used during lay-up?

yes     no

Have clutch been operated during lay-up?

yes     no

Have pumps and other devices been used during lay-up?

yes     no

Was electric power supply permamently or frequently on?

permanently     frequently

Have electronic parts been removed and preserved?

yes     no

Have oil separators or filters been used during lay-up?

yes     no

Have air dryers been used during lay-up?

yes     no

Type of cathodic protection system

ICCP Systems at vessels at same lay-up location

Was propeller windmilling during lay-up?

yes     no

Was shaft brake closed during lay-up?

yes     no

Additional remarks ...

Upload

Minimum size: 19.5 KB

Maximum size: 5.0 MB

Allowed types: jpg,doc,pdf,xls,docx,xlsx

Maximum uploads: 0/10

Uploads left: 10 file(s) left to upload

Files:

CAPTCHA image for SPAM prevention If you can't read the word, click here.

If you contact us via our secure contact form (SSL standard), your entries will be stored in the e-mail inbox along with the contact details you provided to process the request. This data will not be disclosed by us and stored only as long as they are needed to process the request.

Attention: SCHOTTEL service has to be consulted before re-commissioning. SCHOTTEL shall not be liable for any damages occurring during lay-up period or re-commissioning. Our recommendation as well as the presence of one of our engineers shall only be considered as assistance and shall not entitle you to claim any rights or damages.